Structure Type: Cable-Stayed Bridge
Project Scope: Supply & installation
Project Size:
Material: Full locked cables
Location: Raunheim, Germany
Completion Date: 2014
Market Segment: Infrastructure
Owner: City of Raunheim
General Contractor: Wolff & Müller Spezialbau GmbH & Co. KG
Architect:
Structural Engineer: Schüßler-Plan GmbH & IGM Ingenieurplanung GmbH
The delivery and subsequent installation of the stay cables for a bridge in Raunheim was another highlight for PFEIFER in the field of bridge construction.
In the course of this project the newly developed, dynamically loadable fittings Type 700 and Type 710 were installed for the first time. These rope terminations are distinguished by their audited and confirmed fatigue resistance to cyclic loads.