Structure Type: Cable-Stayed Bridge
Project Scope: Supply
Project Size:
Material: Full locked cables & tension rod systems
Location: Herzogenaurach, Germany
Completion Date: 2018
Market Segment: Infrastructure
Owner: PUMA Group
Architect:
Structural Engineer: IBS – Ingenieurbüro Schrittesser
General Contractor: Lamparter GmbH & Co. KG
Get A Free Consultation
Get a free tensile membrane structure consultation with the most experienced designers and engineers in the industry.