Structure Type: Cable-Stayed Bridge
Project Scope:
Project Size:
Material: Full locked cables
Location: Kolbermoor, Germany
Completion Date: 2017
Market Segment:
Owner: City of Kolbermoor
General Contractor: Mühlbauer Stahl + Metallbau GmbH
Architect:
Structural Engineer: ROPLAN
The stay cable bridge crossing the German river Mangfall consists of six full locked cables PV 240 and two full locked cables PV 1010. The shore side PV 1010 cables have a diameter of 100 mm (3,9’’) are equipped with fatigue resistant open spelter sockets type 700 and type 710. All in all even this smaller pedestrian bridge is braced by almost 300 meters (984 ft.) of full locked cables.