Structure Type: Cable-stayed Bridge
Project Scope: Supply
Project Size:
Material: Full locked cables
Location: Bilbao, Spain
Completion Date: 2015
Market Segment: Infrastructure
Owner: City of Bilbao
Architect: Guillermo Capellán
Structural Engineer: Héctor Beade
General Contractor:
Get A Free Consultation
Get a free tensile membrane structure consultation with the most experienced designers and engineers in the industry.