Structure Type: Cable-supported suspension pedestrian bridge
Project Scope: Supply & installation
Project Size:
Material: Full locked cables
Location: Frankenberg, Germany
Completion Date: 2019
Market Segment: Infrastructure
Owner: City of Frankenberg
General Contractor: Vollack Hallen- und Stahlbau GmbH & Co. KG
Architect: Sauerzapfe Architekten
Engineer: ifb frohloff staffa kühl ecker
Its winding course is the reason for the name of the Bridge: “Die Schlange” which means “the snake” in German. The bridge with a single suspension cable was part of a regional garden exhibition. All cables are full locked cables. The hangers (26 mm (1’’)) are connected to the suspension cable (70 mm (2,8’’)) by hanger clamps. The customized clamps fit the unique connection angle of the hangers.