Structure Type: Building Envelope
Project Scope: ETFE foil cushion fabrication
Project Size: 7,100 Square Meters
Material: 800 air-filled, three-layer ETFE foil cushions
Location: Tianjin, China
Completion Date: May 2014
Market Segment: Infrastructure
Owner: China Railway Corporation
General Contractor: TianJin Kangda membranes structure engineering co., ltd.
Architect: The 3rd Railway Survey & Design Institute Group Corporation
Structural Engineer: Arup International Consultants (Shanghai) Co., Ltd. Beijing Branch