Skip to main content

FabriTec Structures Completes Cable Net Structure At Iconic Downtown Los Angeles Street Bridge

By March 19, 2015March 7th, 2018Project Development

Los Angeles “Great Streets” Cable Tension StructureFabriTec Structures has recently completed construction of a cable net structure as part of Los Angeles Mayor Eric Gacetti’s “Great Streets” initiative to support thriving LA neighborhoods.

Garcetti’s “Great Streets” campaign takes on the renovation of 15 iconic streets in the City of Los Angeles. The revitalization effort is intended to beautify and unify Angelenos by activating public spaces, improving public safety, enhancing local culture and providing economic revitalization.

For its part, FabriTec Structures joined Buro Happold in the construction of a 123 foot-long galvanized steel cable net canopy at the Main Street Bridge straddling the US-101 Freeway at Los Angeles Street in Downtown. The project has a total cable net plan area of approximate 2,112 square feet.

Regular project updates including photography and video will be posted weekly on the FabriTec Structures blog and social media network including LinkedInFacebookTwitterGoogle+ & Flickr. Follow us for up-to-the minute tensile membrane and fabric structure news. Find other related FabriTec news about the Los Angeles Street Bridge and other projects searching hash tags #ProjectUpdate and #FabriTec.